
Estepona Town Hall has commenced a project to install 1,250 linear meters of prefabricated concrete walkways along the coastline.
The new walkways aim to replace existing wooden structures that are removed every summer and often damaged by storms, providing enhanced durability and easier maintenance.
The concrete paths, which will be 1.80 meters wide, are designed to improve year-round accessibility for people with reduced mobility, and will connect to amenities including restrooms and lifeguard stations, with an investment of €414,304.
Key facts
- 1,250 linear meters of walkways being installed
- 1.80 meters wide
- €414,304 investment
- 80 units of slip-resistant decking included
What this means for buyers
The installation of new concrete walkways in Estepona means better access to the beach for all, particularly individuals with reduced mobility. The wider paths will improve accessibility from the promenade to both dry and wet sand areas, making the beach more user-friendly year-round. Furthermore, the investment of €414,304 reflects a commitment to enhancing community amenities. Buyers can expect a more durable and convenient beach experience in the area, which may enhance local property appeal.
Based on reporting by Estepona News.